Reconstruction Project of the West Section of the Second Ring Road in Chengdu成都市二環(huán)路西段改造工程

Projects > Municipal Engineering > Reconstruction Project of the West Section of the Second Ring Road in Chengdu成都市二環(huán)路西段改造工程

Reconstruction Project of the West Section of the Second Ring Road in Chengdu成都市二環(huán)路西段改造工程

Project name項目名稱

EPC1, EPC3, EPC4 Contract Sections of the Reconstruction Project of the West Section of the Second Ring Road in Chengdu成都市二環(huán)路西段改造工程EPC1、EPC3、EPC4合同段

Construction unit建設(shè)單位

Chengdu Huachuan Highway Construction Group Co., Ltd., Chengdu Dijian Industrial Co., Ltd., China Airport Construction Ninth Engineering Corps, Chengdu Road and Bridge Engineering Co., Ltd.成都華川公路建設(shè)集團(tuán)有限公司、成都市地建實業(yè)有限責(zé)任公司、中國航空港建設(shè)第九工程總隊、成都市路橋工程股份有限公司

Project Description項目簡介

Chengdu Huachuan Highway Construction Group Co., Ltd., Chengdu Dijian Industrial Co., Ltd., China Airport Construction Ninth Engineering Corps, Chengdu Road and Bridge Engineering Co., Ltd.該項目南起二環(huán)路南府河橋西側(cè),向西經(jīng)紅星路、人南、新光路、永豐、成溫、營門口、九里堤立交,北止二環(huán)路北府河橋西東側(cè),全長15.2公里。主要工程內(nèi)容包括互通立交、快速路系統(tǒng)(高架橋)、道排、大容量快速公交系統(tǒng)(土建部分)、智能交通管理系統(tǒng)(土建部分)及其附屬工程。工程建設(shè)預(yù)計總投資約27億元。

Supply product供應(yīng)產(chǎn)品

Squeezing agent壓漿劑