Xiangpu Railway Sanming Beam Making Field向莆鐵路三明制梁場

Projects > Railway Engineering > Xiangpu Railway Sanming Beam Making Field向莆鐵路三明制梁場

Xiangpu Railway Sanming Beam Making Field向莆鐵路三明制梁場

Project name項目名稱

Sanming Beam Factory三明制梁場

Construction unit建設單位

China Railway Tenth Bureau Group Co., Ltd.中鐵十局集團有限公司

Project Description項目簡介

Xiang (Tang) Pu (Tian) Railway is located in eastern Jiangxi and central Fujian, starting from Nanchang City, Jiangxi Province in the west. The branch from Ning, Jiangle, Shaxian, Youxi to Yongtai is introduced into Fuzhou Station of Waifu Railway and Putian Station of Fuxia Railway respectively. The main line is about 603.6 kilometers long, of which: 384.265 kilometers in Fujian Province, including Nanchang (Xiangtang) , Fuzhou hub and Putian area supporting work, as well as the new Sanming Station to the Pu Railway and the Yingxia Railway in the direction of Nanping, a total of 24 stations.


The Xiangpu Railway Sanmingbei Beam Making Field was put into production at the end of September 2010. The beam yard undertakes the prefabrication task of 3066 bridges in the FJ-2 section of Xiangpu Railway.

向(塘)莆(田)鐵路位于贛東和閩中地區(qū),西起江西省南昌市,自南昌(向塘)樞紐新南昌站引出,經江西撫州、南城、南豐,福建建寧、泰寧、將樂、沙縣、尤溪至永泰分岔,分別引入外福鐵路福州站和福廈鐵路莆田站,正線全長約603.6公里,其中:福建省境內384.265公里,包括南昌(向塘)、福州樞紐和莆田地區(qū)配套工作,以及新三明站向莆鐵路與鷹廈鐵路南平方向的聯絡線工程,共設24個車站。   

向莆鐵路三明北制梁場是從20109月底投入生產的。該梁場承擔向莆鐵路FJ-2標段3066片橋梁的預制任務。

Supply product供應產品

Squeezing agent,expansion agent,release agent壓漿劑、膨脹劑、脫模劑