Project name項(xiàng)目名稱 | Xiangpu Railway Minjiang Bridge Project向莆鐵路閩江橋項(xiàng)目 |
Construction unit建設(shè)單位 | China Railway Bridge Bureau No. 2 Company中鐵大橋局二公司 |
Project Description項(xiàng)目簡介 | Xiang (Tang) Pu (Tian) Railway is located in eastern Jiangxi and central Fujian, starting from Nanchang City, Jiangxi Province in the west. The branch from Ning, Jiangle, Shaxian, Youxi to Yongtai is introduced into Fuzhou Station of Waifu Railway and Putian Station of Fuxia Railway respectively. The main line is about 603.6 kilometers long, of which: 384.265 kilometers in Fujian Province, including Nanchang (Xiangtang) , Fuzhou hub and Putian area supporting work, as well as the new Sanming Station to the Pu Railway and the Yingxia Railway in the direction of Nanping, a total of 24 stations. The Minjiang Bridge has a total length of 7638.81 meters and a total of 362 bridges need to be erected. 向(塘)莆(田)鐵路位于贛東和閩中地區(qū),西起江西省南昌市,自南昌(向塘)樞紐新南昌站引出,經(jīng)江西撫州、南城、南豐,福建建寧、泰寧、將樂、沙縣、尤溪至永泰分岔,分別引入外福鐵路福州站和福廈鐵路莆田站,正線全長約603.6公里,其中:福建省境內(nèi)384.265公里,包括南昌(向塘)、福州樞紐和莆田地區(qū)配套工作,以及新三明站向莆鐵路與鷹廈鐵路南平方向的聯(lián)絡(luò)線工程,共設(shè)24個車站。 閩江特大橋全長7638.81米,共需架設(shè)橋梁362孔,先后跨越京福高速、316國道、濱江大道、福州外環(huán)高速、115縣道。 |
Supply product供應(yīng)產(chǎn)品 | Squeezing agent,grouting material壓漿劑、灌漿料 |