Project name項目名稱 | Quning Railway Fujian Section Project衢寧鐵路福建段項目 |
Construction unit建設(shè)單位 | China Railway Fifth Bureau Group Sixth Engineering Co., Ltd.中鐵五局集團(tuán)第六工程有限責(zé)任公司 |
Project description項目描述 | This project undertakes the construction of the new Quzhou-Ningde Railway (Fujian section) in front of the station. The main line has a total length of 172.056km. There are 58 large and medium bridges with a total length of 22,414.40 meters on the main line (excluding 12-6643.8 meters of connecting lines and running lines). meters), accounting for 13.0% of the length of the main line, and 48.5 main line tunnels with a length of 124.979km (including the Changpugang Tunnel with a total length of 5939.1m and 1220m in Fujian Province), accounting for 72.6% of the main line. The new Quzhou-Ningde Railway (Fujian section) project has a total of 14 stations, including 1 existing station and 14 new stations, with 876 beams and beams.本項目承建新建衢州至寧德鐵路(福建段)站前工程,正線線路全長172.056km,正線共設(shè)有大中橋58座22414.40延米(不含聯(lián)絡(luò)線及走行線12座-6643.8延米),占正線線路長度的13.0%,正線隧道48.5座124.979km(其中菖蒲崗隧道全長5939.1m,福建省內(nèi)1220m),占正線72.6%。新建衢州至寧德鐵路(福建段)工程共設(shè)14個車站,其中既有車站1個,新建車站14個,制、架梁876孔。
|
Supply product供應(yīng)產(chǎn)品 | Superplasticizer減水劑 |